BEN SAID-PREFA COMPANY PROJECT

Turnkey factories

COMPLETE UNIT FOR THE PRODUCTION OF PIPES &BOX CULVERT

The project was carried out in 2018/2019 at the request of the COMPANY “BEN SAID – PREFA” located in SAWEF Governorate of ZAGHOUAN, which is specialized in the field of Public Works and Building (BTP)

The project consists of the realization of a complete installation for the production of Pipes & Boxes

  • Pipes from Ø 600 to Ø 3000 mm
  • Boxes from 600 × 600 to 3000 × 3000 mm.

It is an installation with two production stations comprising

  • Double Station Box Culvert& Pipe Machine:"CARTHAGE 3000 DS"
  • Vibration with central vibrator
  • Automatic concrete feed according to the shape of the mold
  • Automatic product pressing with Gantry Presses
  • Demoulding of finished products using overhead crane
  • Automatic Batching Concrete Plant:
  • A planetary mixer of 1.5 m³ of concrete finished with Skip
  • Two cement silos with a capacity of 65 T.
  • Four aggregate storage hoppers with a capacity of 4x 30 m³
  • A conveyor length 12m, width 600mm
  • Set of molds for Box& pipes
  • Overhead crane: Capacity 25T-Span 20 m
  • Various Handling equipment